chore: implement circuit breaker #9
Triggered via pull request
October 2, 2025 19:07
Status
Cancelled
Total duration
1d 0h 0m 2s
Artifacts
–
replica-tests.yml
on: pull_request
Matrix: build
Matrix: docker-tests
Annotations
5 errors
|
docker-tests (mysql:8.4.3)
The operation was canceled.
|
|
docker-tests (mysql:8.4.3)
The job has exceeded the maximum execution time of 6h0m0s
|
|
build (mysql-8.0.16)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
|
|
build (mysql-5.7.25)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
|
|
build (PerconaServer-8.0.21)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
|