Skip to content

chore: implement circuit breaker #9

chore: implement circuit breaker

chore: implement circuit breaker #9

Triggered via pull request October 2, 2025 19:07
@vsai12vsai12
synchronize #6
circuit-breaker
Status Cancelled
Total duration 1d 0h 0m 2s
Artifacts

replica-tests.yml

on: pull_request
Matrix: build
Matrix: docker-tests
Fit to window
Zoom out
Zoom in

Annotations

5 errors
docker-tests (mysql:8.4.3)
The operation was canceled.
docker-tests (mysql:8.4.3)
The job has exceeded the maximum execution time of 6h0m0s
build (mysql-8.0.16)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
build (mysql-5.7.25)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
build (PerconaServer-8.0.21)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s